Mia - airport/seaport bus station
The Central Park Bus Ground Transportation Center project sets in motion a dramatic transformation of Miami International Airport's "landside" environment, from a harsh and unfriendly experience, to a lush and lively world class gateway .. Continue Here
|
 |
mia - concourse f terminal
The Concourse F Terminal Improvements expands and modifies Gates F4, F6, and F8; providing additional wide body aircraft service and international capacity. Continue Here
|
 |
MIA - terminal wide people mover system
This system connects 8 concourses, 145 aircraft gates, 6 parking structures and an intermodal transportation exchange among helicopters, commercial ground transportation and a seaport busing operation. Integral with this passenger conveyance system are the future development .. Continue Here
|
 |
AMERICAN AIRLINES FEDERAL INSPECTION FACILITY
The Federal Inspection Services Facility (FIS) is a key component of the North Terminal Development (NTD) at Miami International Airport. The elements of the program include: Immigration and Naturalization (INS) & U.S. Customs, now known as “Homeland Security Border Control”; Continue Here
|
 |
mia - parking garage projects
MCHarry has had multiple projects at the Parking Facilities at Miami International Airport. The largest of which has been the Park 7. Continue Here
|
 |
miami intermodal center - Grapeland heights community park
The following project is a Masterplan development of a 40 acre park environment including softball and soccer fields, tennis and basketball courts, community center building and driving range. Continue Here
|
 |
mia - central revenue collection plaza
The Central Revenue Collection Plaza at MIA has elevated the traditionally mundane revenue collection building type, typically utilitarian in nature, to that of a gateway feature element celebrating entry to one of the most dynamic cities in the world. Continue Here
|
 |
tesaircraft maintenance and executive terminal
Originally conceived as a catalyst to revitalize and stimulate growth at a underutilized airport within the Miami-Dade Aviation system, Opa Locka’s Hangar One Executive Terminal delivers on its promise. Since its completion it has borne witness to a dramatic increase in facilities utilization.. Continue Here
|
 |
AIRPORT RESCUE AND FIRE FIGHTING FACILITY
This multi-function complex includes the airport central emergency operations and main communications center together with a mid-field fire station. This is a 26,000sf, two story building located between two active airport taxi-ways. The aircraft rescue and firefighting component includes .. Continue Here
|
 |
FREEPORT INTERNATIONAL MASTER PLAN
MCHarry Associates has created a 135,000 sf phased expansion / renovation to existing airport terminal in Freeport. This area includes international arrivals processing area, bag claim, ticketing/ATO, departure lounges, ground transportation facility and island welcome center. Continue Here
|
 |
ia concourse f ramp level improvements
Concourse F Ramp Level improvements is being constructed under 4 separate bid packages...Continue Here
|
 |
mia skyport - commuter heliport facility
Miami International Airport’s Skyport Terminal was programmed as the first stop in a network of heliports collectively operating as a regional commuter helicopter system serving Dade, Broward, Monroe and Palm Beach Counties. Paired with the Skyride Moving Sidewalk Bridge System...Continue Here
|
 |
mia - concourse f code compliance
a. Phase 1 improvements include installing fire sprinklers and fire alarm systems throughout the concourse.
b. New Construction: 2nd floor office and corridor spaces; toilet rooms;..Continue Here
|
 |
el salvador international airport
MCHarry Associates has served CEPA Port Authority in many aspects over the years. MCHarry Associates designed a 400,000 sq ft, 20-gate expansion of the existing 6-gate terminal which serves immigrations customs facilities. Additionally MCHarry Associates has participated.. Continue Here
|
 |
TECHNIPORT AVIATION SUPPORT FACILITY
The Techniport Aviation Support Facility comprises the first phase of a multi- purpose complex designed to ultimately consolidate onto one 35 acre site. Currently various aviation support activities inefficiently spread over some 75 acres of land along the northern perimeter of Miami International Airport. Continue Here
|
 |
Concourse e international arrivals complex
The program requirements for the Concourse E Terminal was to create a free-standing (satellite) international arrivals terminal, able to accommodate the first 747 jumbo jets to be placed into commercial operation. Twenty–five years later, the “satellite” continues to serve .. Continue Here
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|